Social hostel for the orphanage leavers in the cit » page 2 » Saby Charity foundation

eng.saby.kz

Today: | RUS | KAZ

Construction of Dormitory. Stages
Views: 291 | 21-10-2015 | Orkendeu Project » Social hostel for the orphanage leavers in the cit

The development of design and estimate documentation (DED) for the construction of dormitory in Aktobe city is continued.

To the present time, the official act on land parcel has been executed, geodetic and geological examinations have been performed, sketch plan has been accepted, all technical conditions from corresponding authorities and architectural planning assessment have been received.

The works of land parcel cleaning and layout, fencing assemblage, as wells as temporary facilities installation have been started.

more
 
Construction of Social Dormitory. Stages
Views: 280 | 26-08-2015 | Orkendeu Project » Social hostel for the orphanage leavers in the cit

To the present time, the works of engineering and geological research on the construction site of Social Dormitory for boarding school leavers have been completed.

16 exploration wells were drilled, in the result of which 26 soil samples were selected for laboratory evaluations of their qualities and composition.

Field documentation of drilled wells and results of laboratory investigations became the basis for drawing of the technical report of engineering and geological research, prepared by one of the contractors.

more
 
Construction of Dormitory. Stages
Views: 247 | 03-08-2015 | Orkendeu Project » Social hostel for the orphanage leavers in the cit

The land parcel with total area of 3 ha was allocated for the construction of dormitory for graduates of boarding schools, who have some health problems, by the Akimat of Aktobe city in February of the present year.

We have received all necessary adjustments in reviewing and controlling authorities, land use project has been prepared, as well as topographic-geodesic works have been performed on the land parcel.

At the present time the resolution of Akimat for engineering and construction works of the object is being prepared, after which we will start to process Architectural and Planning Assignment and technical specifications of operating entities.

more
 
Building of Societal Residence Hall. Stages
Views: 469 | 04-06-2015 | Orkendeu Project » Social hostel for the orphanage leavers in the cit

Building of Societal Residence Hall. Stages Saby Charitable Foundation goes on implementing the project of building of societal residence hall for the foster homes leavers in Aktobe city. The pilot project has been developed by this moment, and it is passing the confirmation procedure in the correspondent authorities now.

As per the building project at the land parcel 2.7 ha there will be built two section-type 2-storied townhouses with two entrance hallways and two section-type 2-storied townhouses with three entrance hallways, which have general residential capacity - 80 places; the ground floors of these townhouses will be destined for the residence of the wheel-chair persons. At the ground floor of every section there are entrance hall with double-height ante-room, passage-ways and cage, as well as four one-room flats with area 41 sq.m. each. All flats include a hall, a bathroom, a living room, a kitchen and stanzas. At the first floor there are also 4 one-room flats on each section.

more
 
Building of Residential Community in Aktobe
Views: 900 | 08-04-2015 | Orkendeu Project » Social hostel for the orphanage leavers in the cit

Saby Charitable Foundation in scope of the Project Orkendeu starts the building of a residential community in Aktobe city for the boarding schools graduates who have health disabilities.

This decision has been made on the basis of the data obtained due to the meetings and consultations with the agents of guardianship and wardship authority in Aktobe city as well as after the meeting with Akim of Aktobe city, Aktobe region who were sympathetic to endorse this initiative.

According to available information currently there is only one operating House for youth, which is the institution for the social adaptation of orphan children and for the children without parental care come to this House after graduating the regional boarding schools. This House is 1971 year built, it is obsolete and worn-out; its designated for 100 places but it is permanently overcrowded as children from all over the region come here. Besides the vacant places are deficit there is also a real problem for the boarding schools graduates with mental disabilities, need independent residence as they need more time for adaptation and permanent social-psychological support. Its urgent need to build new building to provide the residence to such group of children.

According to socioeconomic project rationale there is proposition to build a range of 2-floor townhouses with total capacity 80 places; the ground floors of these houses will be designated for the wheelchair users accommodation. We are as well planning to build mini-shops to provide possibility of the labour adaptation to the educatees and also the possibility to work and become financially sufficient. Moreover building of gym, events hall and sports ground is also provisioned. All the objects will meet requirements of the currently valid regulatory documents of the Republic of Kazakhstan. The total area of buildings and facilities will amount approximately 6 000 sq.m.

more
 

previous page 1 2 next page




"Build your own business"
contest


Events Calendar

«    October 2017    »
MonTueWedThuFriSatSun
 1
2345678
9101112131415
16171819202122
23242526272829
3031 

QUICK LINKS