A new social facility has been opened in Aktobe
Views: 320 | 17-12-2016 | Orkendeu Project » Social hostel for the orphanage leavers in the cit

A new social facility has been opened in Aktobe Saby Charitable Fund has opened a new Meyrm Center of a Youth Social Adaptation designed for the personal accommodation of orphan asylum graduates and their quicker adaptation for an adult life in Aktobein honor of the 25th anniversary of Independence of the Republic of Kazakhstan.

BerdybekSaparbayev,an akim of Aktobe region, Ilyas Ispanov,an Akim of Aktobe, as well as Kenes Rakishev, a well-known businessman, philanthropist and Saby co-founder, participated in the Centeropening. The most welcome holiday guests became its future residentsthemselves, because they will not only live herebut willalsoget the basics of their future profession.

An administrative building for the organization of ajob training process and leisure-time activities of center pupils wasalready fully accommodated;a sewing workshop, a shoe-repair shop, a flower shop, a beauty salon, an assembly hall and a hall of physical therapy is equipped with the necessary equipment. Also, a two-storied residential building with 16 single-bedroom apartments wasfinished in a fine finish, first floor of which is designed for personal accommodation of wheelchair persons.

more
 
School construction in Almaty city. Stages
Views: 285 | 11-11-2016 | Orkendeu Project » The High-school for 1200 places at the Almaty cit

School construction in Almaty city. StagesConstruction of the Secondary school designed for 1200 students in Akzhar village of the Nauryzbayskiy District of Almaty city is 70% complete.

At the beginning of December connection of the heating system is planned in order to complete interior finishing of the building. For such purposes installation of internal and external partition walls, insulating glass units and heaters is currently being performed in all 10 building blocks.

In the process of construction only environment friendly materials produced by local manufacturers are used.

more
 
School Construction in Almaty. Stages
Views: 328 | 20-07-2016 | Orkendeu Project » The High-school for 1200 places at the Almaty cit

School Construction in Almaty. Stages Construction works at the site of "Secondary school with 1,200 seats in Akzhar village of Nauryzbayskiy district of Almaty" are in progress.

Floor slabs are being reinforced and a formwork is set at the level + 9.8 m and 12.4 m in units 1, 6, 7, 8, 9. Cross beams are being cast in place at the level +3.2 m in units 2, 3. Brickwork of exterior walls with finishing works is carried out in units 4, 5. Concrete works at the zero circle are executed in unit 10.

Also, at the same time the installation of heating, plumbing, ventilation and sewerage systems is carried out.

See the construction process here.

more
 
Construction of Social Dormitory. Stages
Views: 289 | 09-06-2016 | Orkendeu Project » Social hostel for the orphanage leavers in the cit

Construction of social dormitory for leavers of boarding schools in Aktobe city is in progress.

For the past four months favorable conclusions of complex independent expertise on the main design estimate documentation of the project and external supply lines were received. Corresponding notifications of start-up production of installation and construction works in the local State Architectural and Construction Supervision Authority were registered. Preparatory works of top soil territory clearing were carried out, the land parcel fencing was fixed, temporary communication lines of necessary power were installed. The development of excavations and concrete blinding were fulfilled to 100%.

At present the works of foundation installation of 4 living blocks and one office block are being carried out.

more
 
School Construction in Almaty. Stages
Views: 277 | 10-03-2016 | Orkendeu Project » The High-school for 1200 places at the Almaty cit

Currently all works of foundation installation have been completed, reinforcement and concrete procedures of underfloor walls and floor panels have been fulfilled on 60%.

During the construction of school for 1200 places in Almaty, built by Saby Foundation within the frameworks of the Orkendeu project, special attention was paid to the quality of concrete, in-situ concrete works are fulfilled under a strict control of field and engineering supervision as well as the Customers engineering service.

more
 